Hamada windfarm Commissioning, Japan

A total of 29 wind turbines with a capacity of 1,670 kW per turbine will be installed at Wind Farm Hamada, providing a total capacity of 48,430 kW (approximately 48 MW). The turbines will be located in the Kanagi-cho and Yasaka-cho districts of Hamada City, Shimane Prefecture.

Hamada windfarm (Photo: Softbank)
Hamada windfarm is a wind power plant constructed in Kanagi Town, Hamada City, Shimane Prefecture. (Photo: Softbank)

ENDIPREV was selected to commission 29 wind power generators, the power output is approximately 48,430kW (48.4MW), an estimated 85,000,000kWh annual generation of electricity.